Kingsway Tunnel Refurbishment (Dado Panels)
Liverpool City Region Combined Authority
Go / No-Go Overview
Ready-made bid overview based on the tender docs.
Tender Documents Provided by the BuyerDownloaded from the buyer's tender portal
Description
The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.
Contracting Authority
- Organisation
- Liverpool City Region Combined Authority
- Organisation ID
- GB-PPON-PNDZ-8253-CJJM
- Address
- 1 Mann Island, Liverpool, L3 1BP, United Kingdom
- Region
- UKD72
Buyer Contact
CPV Classifications
Reference Details
- Published
- 12 June 2026 at 11:03
- Reference
- DN818709
- Enquiry Deadline
- 29 June 2026 at 12:00
- Procurement Category
- works
- Procedure Type
- Competitive flexible procedure
- Official Portal
- Go to portal
- Source
- View on Find a Tender
More Asbestos Tenders
- Support Trades Supply Chain FrameworkSUTTON HOUSING PARTNERSHIP LIMITEDDeadline: 29 June 2026
- Asbestos Removal ServicesClwydAlyn HousingDeadline: 30 June 2026
- Asset Compliance & Assurance Framework 2026-30Communities & Housing Investment Consortium Ltd (CHIC)Deadline: 30 June 2026
- Asbestos Surveys and Hosting 2026Dorset & Wiltshire Fire and Rescue AuthorityDeadline: 3 July 2026
Need help writing this bid?
AsbestosTenders.com is the UK's leading asbestos bid writing agency
Full-service support from just £500 per tender